Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
XLP members, Multitrade Spain and Trans Pacific Projects Pty. Ltd., work together to deliver passenger boarding bridges – XLP Projects Network
loader image
News

XLP members, Multitrade Spain and Trans Pacific Projects Pty. Ltd., work together to deliver passenger boarding bridges

2 min read

Multitrade Spain, in a joint cooperation with Trans Pacific Projects Pty. Ltd. in Brisbane, Australia, have recently delivered 2 passenger boarding bridges (PBB’s) at Brisbane’s New International Cruise Ship Terminal. The PBB’s were produced in Spain to the highest standards and requirements of the receiver.

The global environment at the time of shipping with all its restrictions and multiple uncertainties has been the biggest challenge, but the determination of all parties involved to find the right solutions allowed them to have backup plans, just in case.

The execution of the transport required months of planning to ensure the success of this logistical challenge. The job has been carried out on budget and in time to the fullest satisfaction of both, the shipper and consignee.

Some information of the shipment:

Origin: Barcelona, Spain

Destination: Brisbane, Australia

Distance: About 12700 NM via Cape of Good Hope

Dimensions:  23 m x 13 m x 17 m each structure

Weight: 115 tons each

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!