Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Voltrans Logistics handle a big project to set up a textile factory in Vietnam – XLP Projects Network
loader image
News

Voltrans Logistics handle a big project to set up a textile factory in Vietnam

2 min read

Voltrans Logistics Vietnam has successfully handled a big project to set up a textile factory in Vietnam. A total of 13 shipments with different volumes were shipped by sea (LCL and FCL) and air.

 

To reduce the cost for their client, Voltrans suggested holding all cargo when it arrived and then to deliver it in one go to the factory. Next the technical team cooperated with their experts to unload and fix the position inside the factory.

  • Volume: Total 28 x 40’HQ + 1 x 20’ + 09 x 40’FR + 03 x 20. AFR
  • Commodity: Dyecoo Machinery, Textile Machinery, and Toolbox
  • Origin: Italia, Germany, Taiwan, Hongkong, South Korea, Netherlands
  • Destination: Ho Chi Minh City, Vietnam
  • The scope of work: Freight, import customs, transportation, unloading and moving to the position.

Operation procedure:

  • Using a crane, forklifts, jacks, roller skates, a spreader to unload and move cargo to the position.
  • For the processed vessels (boilers), they used two cranes (one big and one smaller) to ensure unloading without any damages. The others should be loaded by two forklifts.
  • Moving the cargo was executed by a forklift, roller skates, and jacks.
  • After finishing, they rechecked the position and cleaned up the job site.

Voltrans Logistics offer innovative Project Cargo Handling solutions as well as technical engineering services to manage the project completely from start to finish and ensure timely delivery of valuable goods. For the second phase of the shipment, they moved and set up a textile machinery to the factory in Vietnam. They have completed the import customs, trucking, unloading and moving to the installation position into the factory.

Project Details:

  • Commodity: Textile machinery
  • POL: La Spezia, Italy
  • POD: Ho Chi Minh, Vietnam
  • Volume: 1×40’HC

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/
Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!