Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
TransProCon AB Executes a Movement of Large PreFabricated Parts to Make a Climate Control Tunnel for Volvo Sweden – XLP Projects Network
loader image
News

TransProCon AB Executes a Movement of Large PreFabricated Parts to Make a Climate Control Tunnel for Volvo Sweden

< 1 min read

TransProCon successfully executed a movement of 30+ large prefabricated and very odd shaped parts to make a Climate Control Tunnel for Volvo Sweden.

The largest piece’s weight was 34 ton with a volume of 460 m3 and the dimensions were LWH 10 x 7 x 6.5 m. This shipment was a total of 4,000 FRT (Freight Tons)

The scope of the shipment was from the fabrication yard to FOT Gothenburg.

Port of Loading: Port of Vigo, Spain

Port of Discharge: Port of Gothenburg, Sweden

Challenges of the move:

–         Very tight schedule from completion of fabrication to delivery, not all pieces were available in the right order, causing several changes to stowage in order to keep vessel loading.

–         The loading berth in Vigo was being used for the first time in many years, and thus presented many unknowns.

–         Additionally, the cargo did not lend itself to simple stowage. It was a good work-out for their cargo superintendents.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!