Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Silent Air and Sea/ Silent Transport and Nova Shipping Coordinate to Ship Five Mixer Tanks from Scotland to New York, USA – XLP Projects Network
loader image
News

Silent Air and Sea/ Silent Transport and Nova Shipping Coordinate to Ship Five Mixer Tanks from Scotland to New York, USA

2 min read

As a UK member of the XLP Projects Network, Silent Air and Sea/ Silent Transport was appointed by their USA agent Nova Shipping to oversee the delivery/ handling and lashing of five mixer tanks for a plant delivery in the USA.

The tanks were transported from a facility in Scotland to Southampton for loading and lashing on flat rack containers.  As the tanks were OOG (Out of gauge), they required special handling and co-ordination to ensure they were transported to a dockside to meet the sailing deadline. The whole process was expertly handled by their team and the end customer was very satisfied with the service provided.  A great team effort by both Nova Shipping and Silent Air and Sea. Detail of the shipment is as following:

Weight: Each vessel weighed 6,000 kg.

Dimensions: 900 x 350 x 350 cm.

Port of loading: Southampton, UK

Port of discharge: New York, USA

Type of travel: Ocean – Flat rack containers – Out of Gauge

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!