Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. Oversee Food Factory Project in Argentina – XLP Projects Network
loader image
News

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. Oversee Food Factory Project in Argentina

2 min read

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. Oversee Food Factory Project in Argentina

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. recently completed a project for a food factory in Argentina having coordinated with all concerned parties. They signed a F/N with the mother vessel and feeder separately, carrying out the road survey to design the workable routing from the factory to the terminal. They then proceed to pick up all the items with the special vehicles in Wuhan whilst loading onto the chartered feeder vessel and dispatching the feeder to Taicang. After the feeder vessel arrived in Taicang, they coordinated with the local terminal to arrange the unloading and made customs clearance to ensure the goods were well prepared for loading before the mother vessels arrival. They monitored the whole process until the goods boarded the mother vessel safely and now the goods are on their way to Bahia Blanca. The rest of the small parts were loaded into 5 containers and dispatched to the same destination.

Food Factory Project in Argentina

Commodity: Vegetable Oil Processing Equipment

CH01 (605×605×275cm / 24,120 kgs / 100.66 m3 )1PC

CH02  (595×595×397cm / 27,760 kgs / 140.55 m3 )1PC

CH03 (645×645×390cm / 25,410 kgs / 162.25 m3 )1PC

CH04 (645×645×393cm / 10,110 kgs / 163.50 m3 )1PC

Total: 4 Pieces,

Weight: 87,400 kgs

Volume: 566.96 m3

Routing: Wuhan-Taicang –Bahia Blanca, Argentina

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!