Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. completes transport of wind generating set – XLP Projects Network
loader image
News

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. completes transport of wind generating set

2 min read

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. completes transport of wind generating set

XLP member, Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd., completed the transport of Wind Generating set from Shanghai to Antwerp,

Details of the shipment: 6×40’FR ex Shanghai – Antwerp EXW

Base Frame: 4 x 3700 x 3460 x 3400 mm /15,22 ton
Hub: 4 x 3300 x 2700 x 3550 mm each 14,30 ton
Axle:4 x 3200 x 2900 x 1700 mm each 7,80 ton
Hollow Shaft:4 x 3900 x 3900 x 780 mm each 8,00 ton
Pitch console: 12 x 600 x 600 x 700 mm eacht 0,20 ton

Shanghai Ba-Shi Yuexin Logistics Development Co., Ltd. sent their people to the factory together with empty FR, concerned lashing and chocking material. They coordinated the operation at the job site, then delivered to terminal directly. Containers were on board safely all the way to Antwerp with the confirmed O/F. Their clients were very satisfied with a job well done.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!