Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
RR Shipping Private Limited airfreights seamless tubes from Ahmedabad, India – XLP Projects Network
loader image
News

RR Shipping Private Limited airfreights seamless tubes from Ahmedabad, India

< 1 min read

RR Shipping Private Limited airfreights seamless tubes from Ahmedabad, India

XLP Member, RR Shipping Private Limited, which has its head office in Mumbai, India handles oversize machinery, transformers and long length pipes for Oil & Gas Industry on regular basis. Recently, they have air freighted 17 feet long length Seamless Tubes from Ahmedabad, India.  Seamless Tubes weighing 21.650 MT were transported from Ahmedabad factory upto Mumbai airport. In spite of heavy congestion at Mumbai (BOM) airport, RR Shipping’s in house customs clearance team swiftly managed to complete customs procedure within a few hours. Due to security restrictions for such long seamless tubes, it was mandatory to open and inspect all the wooden boxes for scanning purposes. The entire RR Shipping team worked over night to open, inspect and repack the boxes after security check. Finally ensuring that the cargo was Air Lifted at 3.00 AM maintaining the commitment to their customer.

 

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!