Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Origin Logistics continues to perform handling project cargoes – XLP Projects Network
loader image
News

Origin Logistics continues to perform handling project cargoes

2 min read

Origin Logistics continues to perform handling project cargoes

XLProjects Turkish partner Origin Logistics have utilised their experienced team by smoothly coordinating and handling two impressive project cargo shipments recently.

One shipment was for the Vietnamese Fire Station Department whilst the other was for a Construction Fabric located in Chile.

Origin Logistics sent two fire trucks for the Vietnamese Fire Station and they transfered an entire cement factory piece by piece from Turkey to Chile

Origin Logistics had been in charge of the forwarding, lashing, securing, loading and transferring to the vessel. The whole process had been controlled closely by the project team of Origin Logistics.

Here you can find some images regarding those two shipments.

 

Origin Logistics have also continued regular project cargoes that include multi-modal transportation, such as the recent shipments below:

  • Shipments of marbles and construction chemicals which are delivered from worldwide via containers and then are transferred to the rail cars in Poti Port for continuing their way to the CIS countries for the construction projects.
  • Main supplies such as plaster and insulation materials for the construction industry in Turkmenistan.
  • Partial bulk vessel transferred from Greece to Turkmenistan via Don-Volga Canal
  • Marbles loaded in Greece
  • Caterpillars, isolation materials and plasters loaded in Derince, Turkey

All operational steps for each project were coordinated and organized with care by Origin’s qualified team.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!