Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Megalift Transport for East Coast Rail Link (ECRL) Project in Malaysia – XLP Projects Network
loader image
News

Megalift Transport for East Coast Rail Link (ECRL) Project in Malaysia

2 min read

This month, the Megalift team and equipment are occupied with the handling of shipments for East Coast Rail Link (ECRL) project. They have 6 units of locomotives entering via Kuantan Port and 95 units of wagons that arrived in Port Klang, both via conventional vessels. Their team and equipment have been mobilised to receive the cargoes and deliver them in batches to Kuantan for the installation to take place.

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Locomotive (6 units)

Dimension: L22.00 m x W3.30 m x H4.74 m

Weight: 150 ton each

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Wagons (95 units)

Dimension: L14.10 m x W3.18 m x H1.43 m

Weight: 24 ton each

Simultaneously, they are also handling the import of Tamping Machines via Port Klang and 12,000 tons of rails via Kuantan Port. It’s certainly a busy month for the team but they are glad to be a part of this 665-km long railway project.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Tamping Machine

Dimension: L17.00 m x W3.15 m x H3.41 m

Weight: 48 ton

Cargo: Rails (8,000 pieces)

Dimension: L25.00 m

Weight: 1.5 ton each (total 12,000 ton)

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!