Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Freight Traders Ltd New Zealand Combined With Fellow XLP Member Globe Cargo Logistics (China) For More Power Station Cargo To USA – XLP Projects Network
loader image
News

Freight Traders Ltd New Zealand Combined With Fellow XLP Member Globe Cargo Logistics (China) For More Power Station Cargo To USA

< 1 min read

Freight Traders Ltd New Zealand Combined With Fellow XLP Member Globe Cargo Logistics (China) For More Power Station Cargo To USA

Freight Traders Ltd (FTL) New Zealand secured another USA refurb project ex China. This is the second project shipment between Freight Traders Ltd in collaboration with fellow XLP member GCL – Globe Cargo Logistics (China). It included preheaters / separators / vaporizers and other miscellaneous parts.

The Vaporizer had measurements of 21.10L x 2.90W x 3.10H / 100 tonnes. The Preheaters had measurements of 21.10L x 2.87W x 3.05H / 73.7 tonnes each (x3).

The project was awarded late once again requiring swift action to meet the tight deadlines needed to make the nominated ship. GCL arranged suitable equipment and trucks for receiving the cargo under hook in Luojing terminal Shanghai, with very little notice, & FTL arranged late receiving and ocean freight. Thanks to the experience of both XLP partners the shipment was loaded and secured in time and on budget. It required full use of resources, to co-ordinate with all parties including the factory, trucks, customs, vessel owners and ground agents.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!