Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Freight Connection complete 12 MW Waste Heat Power Generation System Project – XLP Projects Network
loader image
News

Freight Connection complete 12 MW Waste Heat Power Generation System Project

2 min read

Freight Connection Pakistan Pvt. Ltd has done yet another special Project of 12 MW WASTE HEAT POWER GENERATION SYSTEM ALONGWITH WHR-PLANT INTEGRATION SOLUTION being installed in District Punjab covering completed handling from POL (Shanghai) till POD (Karachi) of steel structure and assembly components of the power generation system, distance from Karachi till Site is approximate 1283 Kms.

Role of Freight Connection Pakistan:

Right from Shanghai Port till final destination, Freight Connection Pakistan handled the project which was a real challenge during this COVID-19 outbreak, and handling such complex cargo of high-quality steel structure and assembly components of this plant is always been difficult task to arrange within a given time frame. Their dedicated Project team has made it possible by making close coordination with a foreign agent and worked non-stop to make it successful.

Project Details:

2850 CBM cargo inclusive of the followings

  • Containers (35×40’)
  • Steel Structure
  • Construction material
  • Equipment of Plant and Machinery

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/
Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!