Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
FLS Projects start 2017 off strong with a collection of interesting shipments – XLP Projects Network
loader image
News

FLS Projects start 2017 off strong with a collection of interesting shipments

< 1 min read

FLS Projects start 2017 off strong with a collection of interesting shipments

Firstly, FLS Projects had delivered crucial items for the 1,244 MW Duyen Hai 3 power plant in Vietnam. At the end of January 5,400 cbm of fans components were loaded in Shanghai, China and then made their way to Ho Chi Minh City, Vietnam. FLS Projects’ scope included the port handling in Shanghai, the chartering of a suitable MPP heavy lift vessel as well as the discharging operations in Vietnam.

Furthermore, FLS Projects Thailand also completed loading of approximatley 137 Vacuum Insulated Pipe Spools with different diameters ranging from 8 to 26 inches and length of up to 36m. The shipment had a total volume of approximately 7,500 CBM and a total GW of 750 MT. FLS’ scope included: – The fabrication and installation of wooden saddles, Shrink wrapping, Road transport from the factory to the port, Port handling and FAS delivery and Chartering of a vessel from Laem Chabang to Freeport. The vessel departed from Laem Chabang Port, Thailand to Freeport, USA on January 26th

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!