Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
EGL Ongoing Heavy Transport for Egypt Mega Projects – XLP Projects Network
loader image
News

EGL Ongoing Heavy Transport for Egypt Mega Projects

< 1 min read

EGL Ongoing Heavy Transport for Egypt Mega Projects

Egyptian Global Logistics S.E.A. (EGL) subsidiary of Kadmar Group completed the discharging of a Dismantled Liebherr LR1400-2 Crawler Crane of 500 tons capacity/ 47 pieces/ Weight of 412 tons/ 1064.010 CBM by using a Mobile Shore Crane of 250 tons at Alexandria Port.

EGL continue to impress the market with their well-trained staff along with the latest fleet equipment in Egypt.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!