Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
EGL keep busy with several recent projects – XLP Projects Network
loader image
News

EGL keep busy with several recent projects

2 min read

EGL keep busy with several recent projects

EGL have successfully discharged 1 telescopic Joint of 45 tons / 54.054CBM (24.75 x 1.4 x 1.56 M) at Alexandria port and was transported by one of EGL’s telescopic extendable trailer.

EGL also effectively discharged 4 unites x 80 tons of Bulb turbines generators at Alexandria Port using a Floating crane of 100 tons’ capacity.

Two heavy parcels (Hammer Spreads) of 110 tons/200.51 CBM each discharged at Port Said port by using Suez Canal Floating Crane of 200 tons’ capacity and stored safely at Port Said yard.

 

 

One unit UNP Hammer of 135.500 tons / 258.216 M3 / 18 M length discharged at Alexandria port by using a mobile shore crane of 500 tons.

 

Part shipment out of Scholz Hot Air Autoclave Plant of 40 tons measurement of (13.10 x 4.40 x 4.23 M) which was discharged at Alexandria Port and transported by EGL’s Trailer.

 

A parcel of Telescopic Joint of 42 tons weight / 92.948 CBM (28.00 x 1.70 x 1.90 M) discharged at Alexandria Port by using mobile shore crane of 100 tons capacity and transported by EGL’s trailer, stored at Alexandria Yard and re‐transported to the client at Abu Kir Port.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!