Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
City Union Logistics moves large-scale transformers – XLP Projects Network
loader image
News

City Union Logistics moves large-scale transformers

2 min read

City Union Logistics successfully completed a two and a half month move of three sets of transformers from Jinan, Shandong to the Egypt New Abu Qir Power Station this January 2020.

The scope of work included all the document handling for the whole transportation, Inland transportation from Jinan factory to Tianjin port, cargo receiving at Tianjin port, heavy lift vessel chartering, cargo receiving at Alexandria port, arranging the trailer at discharging port and then transporting the transformer and accessories by trailer to New Abu Qir Jobsite.

As is the practice, extensive study and survey was conducted as part of this movement regarding the origin, destination and the travel route. Each point of the entire project was carefully assessed to ensure a fool proof and smooth journey of the cargo. The transformers were moved in an SPMT trailer and offloaded using jack and slid. The entire movement was done overcoming lot of challenges and as usual their team were enthusiastically delivering their best throughout the process.

Project Specifications:

Total: 82PKGS / 699164kgs / 1443CBM

Main body is 125 tons with dimensions of 7.4m x 3.85m x 4.4m.

Commodity: 3 sets of transformers and accessories

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/

Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!