Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Cargo Consolidators Agency Moves Various Cargo Including HB Rental Units and Chemical CCU from Trinidad to Suriname – XLP Projects Network
loader image
News

Cargo Consolidators Agency Moves Various Cargo Including HB Rental Units and Chemical CCU from Trinidad to Suriname

2 min read

Cargo Consolidators Agency was contacted by their client to move 332 pieces of cargo, with the weight of 460.5 MT and the volume of 663.79 CBM, from Trinidad to Suriname.

With a short window to work with, they had to position a vessel from Barbados to Chaguaramas port to load cargo within a 24-48-hour window. With their experience in maritime logistics, they successfully got the job done.

The cargo consisted of HB Rental Units (Half-baht Rental Units), Chemical (hazardous & non-hazardous) CCU (Critical Care Units), Tote Bags, Pallets etc.

There were existing challenges faced during this project:

  • Sourcing an appropriate vessel to accommodate the cargo
  • Positioning cargo throughout the island to Chaguaramas port in a short timeline for loading Rotation of trucks to ensure all cargo is loaded
  • Proper stowage plan of cargo on vessel
  • Customs examination of all cargo
  • Spring tide
  • Weather conditions
  • Availability of berth at both Origin and Destination

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!