Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Cargo Consolidators Agency Ltd’s Recent Achievement with Air-Cooled Heat Exchangers & Accessories – XLP Projects Network
loader image
News

Cargo Consolidators Agency Ltd’s Recent Achievement with Air-Cooled Heat Exchangers & Accessories

2 min read

Cargo Consolidators Agency Ltd. has recently undertaken a role in facilitating an urgent freight shipment for a time-sensitive plant turnaround. The objective of this shipment was to arrange coordination, clearance, and delivery of the shipment within a challenging time frame.

The Cargo Consolidators team took charge of various responsibilities, including coordinating the pick-up from the supplier, securing bookings with the nominated shipping line, coordinating with the port and customs for direct delivery, clearance with the brokers, and securing delivery to the site via the nominated haulers.

Due to the size of the freight special arrangements, including police escorts, transport details were communicated via newspaper advertisements through the Municipal Corporations to ensure a smooth journey.

According to the readiness of the freight, the shipment was divided into four (4) parts. The total piece comprised 13 Air Cooled Heat exchangers and 23 crates of accessories.

The transportation convoy included:

– 13 Heavy Duty Extendable Rear Steer Lowboy Trailers for the Air Cooled Heat Exchangers

– 6 Light Duty Tractor Truck, Flatbed for the accessories

Project Details:

– Total CBM 2921.66

– Weight 378,463.21 Lbs

– Port of Load – Houston, Texas

– Port of Discharge – Point Lisas, Trinidad

– Delivery to the site – Point Fortin, Trinidad

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!