Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Aprojects GmbH Arranges Transport from Czech Republic to Germany – XLP Projects Network
loader image
News, Uncategorized

Aprojects GmbH Arranges Transport from Czech Republic to Germany

2 min read

Commodity: Turbine

Dimension / Weight: 660 x 415 x 390 cm – 71 ton

Transport was done by follow lowbed combination: 4-axle Truck + 3-axle Dolly + 5-axle lowbed Trailer

Total dimension and weight of the transport: 2,700 x 415 x 440 cm and 120 ton

Cargo was loaded in Brno, Czech Republic. After 3 Transport nights they arrived on final delivery place in Stapelfeld, Germany.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!