Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Multimodal Movement of ODCs/Heavylifts for a Petrochemical Refinery in East India – XLP Projects Network
loader image
News

Multimodal Movement of ODCs/Heavylifts for a Petrochemical Refinery in East India

2 min read

The Coastal Shipping + Road Transportation of 2 Crystallizers & a Dehydration Tower was executed from the load ports on west coast of India upto the Refinery site in eastern India.

Receiving the cargo at the designated load ports on the western coast, coastal shipping upto the discharge port on the eastern coast, discharging the cargo onto the hydraulic axle trailer combinations and road transportation to the Refinery involved Total Movements‘ complete scope.

The key highlights of this challenging Multi-modal move included:

1. Large dimensions rendering the cargo unfit for direct road transportation
2. Unavailability of domestic flag vessel which can move the cargo by sea
3. Civil works within the discharge port due to large cargo dimensions
4. Bypass building of 800meters in the last mile road from nearest port to site
5. Electrical shutdown required in the enroute

With detailed planning and continuous follow up, our team delivered these critical ODCs well in time.
A heartfelt gratitude to all the stakeholders involved who supported us in making this a seamless execution.

Moving Cargo with Passion!
https://totalmove.in/

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!