Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Kamor Logistics Ltd. Recently Handled a Dismantled Jack Up Rig to The Netherlands. – XLP Projects Network
loader image
News

Kamor Logistics Ltd. Recently Handled a Dismantled Jack Up Rig to The Netherlands.

2 min read

During February to March 2024, Kamor Logistics Ltd. handled the transportation of a dismantled Jack Up Rig, weighing approx.. 2000 freight tons, with 35 skid and 3 containers, transporting from Ashdod Port in Israel to Moerdijk in The Netherlands.

 

Regarding the challenges, the Kamor Logistics Team chartered-in a General Cargo Coaster Vessel and provided the full service, from ‘free-on-truck’ at vessel’s side at load-port to ‘free-on-board’ at destination.

 

Additionally, they have managed for the pre-carriage formalities and arrangements, and managed the loading, stowage and lashing at load port; following with the voyage to cargo’s destination.

 

Upon arrival at Ashdod Port, the streamlined approach ensured efficient reception, and their team assured the proper loading and stowage in vessel’s hold according to the preapproved plan. Despite stormy weather and rough seas, their rigorous lashing and securing procedures ensured safe arrival at the destination, intact and satisfying both shippers and receivers.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!