Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Locomotives for Finland – Trans-Trading Takes Care! – XLP Projects Network
loader image
News

Locomotives for Finland – Trans-Trading Takes Care!

< 1 min read

Locomotives for Finland – Trans-Trading Takes Care!

The fleet of the Finnish State Railways (VR) will receive further Locomotives. On behalf of Trans-Trading Hamburg, the Lübeck Port Company (LHG) has recently refitted three Vectron locomotives, each one 90 tons in weight and 19,044 x 3,046 x 44,00 mm in dimensions. In total, eleven of those heavyweights will be shipped by rail and sea to Finland in 2018.

The three locomotives have travelled “on their own axles” from the Bavarian plant in Munich to the Seelandkai terminal, where they were prepared for the ocean transport to Hanko/Finland.

The Trans-Trading lifting gear was fixed on the mobile cranes and the reloading of the locomotives from rail onto heavy duty roll trailer were handled with Trans-Trading transport beddings attached underneath the locomotives.

LHG and Trans-Trading were jointly executing the sophisticated security measures to meet all safety requirements. After the heavy package was tied properly, dockers pulled the roll trailers with the three locomotives aboard a Transfennica ship.

“Loading of these heavyweights is something very special,” Uwe Wolter and Jens von Beuningen, Port Manager and Project Manager for general cargo / heavy cargo at Trans-Trading expressively point out. “The securing of the locomotives on the roll trailer is very demanding and ambitious, but due to many years of experience and know-how, all work can be carried out appropriately and according to the regulations.”

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!