Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
City Union Logistics’ Complex Shipment: 2 Transformers Arrive in Honduras – XLP Projects Network
loader image
News

City Union Logistics’ Complex Shipment: 2 Transformers Arrive in Honduras

2 min read

City Union Logistics has achieved a milestone by delivering 2 sets of transformers, totaling 26 packages weighing 656 CBM/ 267T, from China to Honduras. These transformers had specific dimensions: one main body weighing 67T with dimensions 7.8m x 3.7m x 4.2m, and another main body 64T with dimensions 7.5m x 3.8m x 4m.

Despite there being no heavy lifting break bulk vessel support on-site to execute this shipment. The City Union Logistics team chose the container solution due to the lack of direct service from China to Honduras. CMA accepted this shipment as a transit service.

This complex shipment involved a heavy lift main body shipped as BBK, along with 7 x 40HQ loading accessories and 4 x 20GP SOC loading for transformer oil – all shipped as one lot on a single vessel with transit via Kingston.

Thanks to their professional team’s analysis, and discussions with customs brokers, terminals, and carriers, City Union Logistics successfully completed this operation and ensured all the containers and cargo were loaded on the planned vessel.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!