Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Global Logistics Projects Transports Chemical Plant Equipment from the Netherlands to Bangladesh – Successful Negotiation Resulted in Big Saving – XLP Projects Network
loader image
News

Global Logistics Projects Transports Chemical Plant Equipment from the Netherlands to Bangladesh – Successful Negotiation Resulted in Big Saving

< 1 min read

Global Logistics Projects recently transported 29 packages of chemical plant equipment from the Netherlands to Bangladesh. The gross weight was 79,347 kgs and the volume of the shipment was 413.1 m3.

Port of Loading: Port of Rotterdam, Netherlands

Port of discharge: Port of Chittagong, Bangladesh

This move was quite a challenging move because the shipping case was 420 cm height, and all the container shipping lines declined this load as 40’FR FCL/FCL. Due to their good relationship with CMA CGM project division, Global Logistics Projects showed and explained to them that such a FR can be loaded with chains, not possible with regular container spreader.

The result: big advantage for their client – the negotiation resulted in a saving of 55,000 – 70,000 USD because otherwise they would have booked this under breakbulk.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!