Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Megalift Transports a Transformer Crossing the Thai-Malaysia Borders – XLP Projects Network
loader image
News

Megalift Transports a Transformer Crossing the Thai-Malaysia Borders

2 min read

The transformer, along with its accessories, was imported for a 50 MW large-scale solar plant currently in construction. Malaysia’s large-scale solar projects are mushrooming thanks to the country’s direction towards building renewable energies.

Megalift received the transformer at the Thai-Malaysia borders from their partner in Thailand. Upon loading it onto their multi-axle trailers, they started the transport from the border to the solar plant site, approximately 170 kilometres away.

At the solar plant site, they mobilised their equipment and team to move the transformer to its foundation. From their trailer they jacked up the transformer and slowly skidded it onto its plinth. Since transformers are usually heavy, coupled with space limitation at construction sites, the jack and skid method is usually executed to safely position the transformer.

Cargo: Transformer
Dimension: L 6.5 m x W 2.75 m x W 4.05 m
Weight: 50 ton

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!