Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Tiel Logistics B.V. Moves S5000 Baler – XLP Projects Network
loader image
News

Tiel Logistics B.V. Moves S5000 Baler

< 1 min read

Tiel Logistics has successfully hauled a S5000 Baler from Poland to their own warehouse in Alblasserdam, the Netherlands for stuffing, lashing, and securing onto a flatrack.

Then, Tiel Logistics also managed the sea freight and shipped this baler from POL Rotterdam in the Netherlands  to CFR Caucedo, Dominican Republic.

The weight of the S5000 Baler was 19 tons and its dimension was 780 x 255 x 279 cm.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!