Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
LC van Tiel Logistics BV Moves Hammer in Cradles and Sleeve – XLP Projects Network
loader image
News

LC van Tiel Logistics BV Moves Hammer in Cradles and Sleeve

< 1 min read

LC van Tiel Logistics BV successfully loaded two items with a weight of 160 tons each. Moreover, they also handled seven accessories from Akita, Japan to Singapore. Details of the shipment:

Commodity Quantity Length (m) Width (m) Height (m) Weight (Ton) CBM
S1400 Hammer in Cradles 1 14.95 4.63 2.71 160.00 187.519
Sleeve 5200 mm 1 5.65 5.65 4.82 160.00 153.914
Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!