Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Cedars Investment Limited moves transformers – XLP Projects Network
loader image
News

Cedars Investment Limited moves transformers

< 1 min read

Cedars Investment Limited successfully moved two transformers from Port of Dar es Salaam, Tanzania to Geita, Tanzania. The transformers weighed 72 tons with dimensions of 7.1m x2.7m x 3.7m and the overall total distance was 1,500 km. The challenge Cedars Investment faced was that they had to work around the road rules in Tanzania as this cargo was considered to be abnormal in weight (72 tons).

Under the regulations of the Axle Load Control regulated under the Road Traffic Act, the front axle load was limited to 8 tons, and axle unit limitations are 18 tons for tandem axle group and 24 tons for triple axles group. The Regulation allows for 5% tolerance and any overloads above this limit must be offloaded or re-arranged. To continue with overload beyond 5%, the transporter will have to pay a surcharge fee of four times its overload per vehicle. However, Cedars Investment Limited was able to overcome this challenge and successfully completed the move.

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!