Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ban-users domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u382405524/domains/xlprojects.net/public_html/staging/wp-includes/functions.php on line 6131
Sea Cargo Logistics handles Hydraulic press to Mexico – XLP Projects Network
loader image
News

Sea Cargo Logistics handles Hydraulic press to Mexico

< 1 min read

Sea Cargo Logistics participated in the transport and the reception of 1 x Hydraulic Press H19-3700 Type HDZ 800 and 3 ancillary equipments from Germany to Mexico. The cargo arrived in Veracruz port on RORO vessel, cargo on MAFI which they later arranged to be unstuffed using a Gottwald crane at the terminal and in coordination with the stevedore team.

During the port offloading and unstuffing process they arranged for a Marine Surveyor. Sea Cargo arranged for the inland transportation from Veracruz port to two different sites in Puebla State using one modular equipment and one Lowboy.

Due to the width and weight of the main unit, they decided to apply for special permits as well as several obstacle removals on the road to the client. As a result, the cargo arrived on site without delays from their side, transport and port operations were both completed satisfactorily, the cargo was offloaded to final position at site and received in a clean condition.

Details of the load:

  • 1 x 8.45*5.8*3.7m / weight 104.00 tons
  • 1 x 5.9*2.3*2.55m / weight 5.02 tons
  • 1 x 6*2.3*2.1m / weight 7.32 tons
  • 1 x 2.9*1.8*2.8m / weight 2.10 tons

Port of Loading and Discharge:

  • POL: Zeebrugge
  • POD: Veracruz

Recent Post
Rack Shipment
Manuport Logistics Greece and Round Logistics Drive Successful OOG Flat Rack Shipment Through XLP Collaboration
News
XLProjects Network (XLP)
Tianjin-to-Libya Shipment Demonstrates Heavy Project Cargo Capability by Xiamen Rosen Shipping
News
W.T.I (Cambodia) Co., Ltd. in Phnom Penh, Cambodia joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!